• Facebook
  • Twitter
x

RealTime Images

  • Portfolio
  • About
  • Contact
  • Video
  • Blog
  • Archive
Show Navigation
search results
Cart Lightbox Client Area
Prev 58 of 84 Next

20190219_zab_s197_059.jpg

Add to Lightbox Download

February 19, 2019 - MonçãO, Portugal - A wind turbine seen operating at the sub park Mendoiro-Bustavade, one of the 5 sub parks of the Alto Minho Wind Farm, Monção, Portugal..The Alto Minho Wind Farm has an installed capacity of 240 MW, distributed in five sub-parks, designated by Picos, Alto do Corisco, Santo António, Mendoiro-Bustavade and Picoto-São Silvestre. In the north part of the country, the Alto Minho Wind Farm in the Viana do Castelo district, of Portugal, became fully operational in November 2008. At the time of completion, it was Europe's largest on-shore wind farm. The wind farm consists of 68 Enercon E-82 2MW wind turbines and 52 Enercon E-70 E4 2MW turbines, for a grand total of 240 MW. The wind farm produces 530 GWh annually, avoiding 370,000 tonnes (410,000 tons) of carbon dioxide emissions. On March 2018, Portugal generated more renewable energy than it needed for the first time in at least 40 years. Energy from renewable sources made up 103.6 per cent of mainland electricity consumption, according to data from the country’s power grid operator REN, although fossil fuels were used to occasionally top up the electricity supply. (Credit Image: © Omar Marques/SOPA Images via ZUMA Wire)

Filename
20190219_zab_s197_059.jpg
Copyright
Represented by ZUMA Press, Inc. RealTime Images
Image Size
4500x2995 / 1.8MB
www.zumapress.com
alto minho wind farm energy parks turbines sources electricity mendoiro bustavade park operate omar marques zselect zagency zarchive zwire omarques_windfarm_19022019 _2_ jpg zlast24 20190219_zab_s197_059 jpg
Contained in galleries
Client Search - 6 June 2019
twitterlinkedinfacebook
February 19, 2019 - MonçãO, Portugal - A wind turbine seen operating at the sub park Mendoiro-Bustavade, one of the 5 sub parks of the Alto Minho Wind Farm, Monção, Portugal..The Alto Minho Wind Farm has an installed capacity of 240 MW, distributed in five sub-parks, designated by Picos, Alto do Corisco, Santo António, Mendoiro-Bustavade and Picoto-São Silvestre. In the north part of the country, the Alto Minho Wind Farm in the Viana do Castelo district, of Portugal, became fully operational in November 2008. At the time of completion, it was Europe's largest on-shore wind farm. The wind farm consists of 68 Enercon E-82 2MW wind turbines and 52 Enercon E-70 E4 2MW turbines, for a grand total of 240 MW. The wind farm produces 530 GWh annually, avoiding 370,000 tonnes (410,000 tons) of carbon dioxide emissions. On March 2018, Portugal generated more renewable energy than it needed for the first time in at least 40 years. Energy from renewable sources made up 103.6 per cent of mainland electricity consumption, according to data from the country’s power grid operator REN, although fossil fuels were used to occasionally top up the electricity supply. (Credit Image: © Omar Marques/SOPA Images via ZUMA Wire)