• Facebook
  • Twitter
x

RealTime Images

  • Portfolio
  • About
  • Contact
  • Video
  • Blog
  • Archive
Show Navigation
Cart Lightbox Client Area
1 of 1

53278848

Add to Lightbox Download

Workers lay flooring during the construction of a field hospital, which will hold up to 340 beds for coronavirus patients, at Llandarcy Academy of Sport, Neath, as the health services in the Swansea Bay area prepare their response to the coronavirus outbreak.

Filename
53278848.jpg
Copyright
PA Wire/PA Images RealTime Images RealTime Images
Image Size
5120x3416 / 10.9MB
covid 19 covid-19 coronavirus swansea bay university health board. NHS Wales HEALTH Coronavirus
Contained in galleries
Coronavirus UK - 3 April 2020
twitterlinkedinfacebook
Workers lay flooring during the construction of a field hospital, which will hold up to 340 beds for coronavirus patients, at Llandarcy Academy of Sport, Neath, as the health services in the Swansea Bay area prepare their response to the coronavirus outbreak.